KOTA PALU |
Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu |
Pekerjaan JaIan Tondo 1 Phase 2 |
1799.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu |
Pekerjaan Drainase Tondo 1 Phase 2 |
570.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu |
Pekerjaan RTH Tondo 1 Phase 2 |
5540.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu |
Pekerjaan TPS3R Tondo 1 Phase 2 |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu |
Pekerjaan DPT Tondo 1 Phase 2 |
385.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu |
Jalan Lingkungan Balaroa |
530.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu |
Drainase Balaroa |
2527.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu |
Ruang Terbuka Hijau Balaroa |
1990.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu |
Penerangan Jalan Umum Balaroa |
31.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu |
Dinding Penahan Tanah Balaroa |
410.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi |
Pekerjaan Rehabilitasi Intake Bora |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi |
Pekerjaan Rehabilitasi IPA Dan Reservori Bora |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi |
Pekerjaan Jaringan Pipa HDPE Bora Pombewe, Watunonju dan Oloboju |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Jalan Lingkungan Tondo 2 |
13841.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Drainase Tondo 2 |
25918.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Ruang Terbuka Hijau Tondo 2 |
9725.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Penerangan Jalan Umum Tondo 2 |
307.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Dinding Penahan Tanah Tondo 2 |
0.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Bronjong Tondo 2 |
0.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
IPAL Tondo 2 |
2.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Pipa Distribusi Jaringan Air Limbah Tondo 2 |
24496.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Sambungan Rumah Air Limbah Tondo 2 |
1055.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
TPS3R Tondo 2 |
1.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Reservoir 500m3 Tondo 2 |
1.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Sumur Dalam Tondo 2 |
2.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Pipa Distribusi Jaringan Air Minum Tondo 2 |
19628.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Biofilter Tondo 2 |
41.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu |
Sambungan Rumah Air Minum Tondo 2 |
1102.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan jalan sepanjang 7043m, Talise Area |
7043.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan Drainase 11693m, Talise Area |
11693.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan RTH 52000m2, Talise Area |
52000.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan PJU 221 Unit, Talise Area |
225.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan DPT 18860m, Talise Area |
18860.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan Bronjong 6500m2, Talise Area |
6500.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Toilet Umum 5 bilik 1 unit, Talise Area |
687.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan Persampahan, Talise Area |
2.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan 2 SPALDT, masing-masing 2590m2, Talise Area |
12591.00 |
|
|
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pekerjaan SPAM (Reservoir, SR, Jaringan Air), Talise Area |
671.00 |
|
|
KABUPATEN SIGI |
Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi |
Pekerjaan Outlet dan Normalisasi Sungai Pombewe sepanjang 375m, Pombewe Area Phase II |
0.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi |
Pekerjaan Penanganan Tebing 940m, Pombewe Area Phase II |
650.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi |
Pekerjaan Jalan Inspeksi dan drainase Reservoir 650m, Pombewe Area Phase II |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi |
Pekerjaan Gedung Pertemuan, Pombewe Area Phase II |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi |
Pekerjaan pedestrian dan talud kavling, Pombewe Area Phase II |
0.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi |
Pekerjaan pintu gerbang, Pombewe Area Phase II |
0.00 |
0 |
0 |
KOTA PALU |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
Jaringan Transmisi Watutela-Poboya (WTP Watutela akan ke tondo 1) |
3551.00 |
|
|
KOTA PALU |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
Jaringan Distribusi Utama Talise |
845.00 |
|
|
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Sambungan Rumah Air Limbah |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Pekerjaan Jaringan Pipa dan SR Desa Pombewe, SPAM Piping Network for Huntap Pombewe |
205.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Pekerjaan Jaringan Pipa HDPE Desa Loru dan Pombewe, SPAM Piping Network for Huntap Pombewe |
0.00 |
0 |
0 |
KOTA PALU |
Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu |
Pekerjaan Penggantian Pipa Transmisi, SPAM Poboya & SPAM Huntap Duyu |
1134.00 |
0 |
0 |
KOTA PALU |
Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu |
Pekerjaan relokasi jaringan distribusi, SPAM Poboya & SPAM Huntap Duyu |
774.00 |
0 |
0 |
KOTA PALU |
Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu |
Pekerjaan Jaringan Pipa 385m ke Huntap Balaroa, SPAM Poboya & SPAM Huntap Duyu |
1.00 |
0 |
0 |
KOTA PALU |
Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu |
Pekerjaan Pengadaan Mesin Pompa untuk Huntap Duyu, SPAM Poboya & SPAM Huntap Duyu |
383.00 |
0 |
0 |
KOTA PALU |
Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi |
Pembangunan Lokasi Pengolahan (Recycling), Debris Waste Management in Kota Palu |
0.00 |
|
|
KOTA PALU |
Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi |
Penghancuran Gedung/Fasilitas Publik Rusak dan Pengangkutan ke TPA, Debris Waste Management in Kota Palu |
0.00 |
|
|
KOTA PALU |
Optimalization of IPLT in Kota Palu and Kabupaten Sigi |
Pekerjaan atap penutup Sludge Dry Bed, IPLT in Kota Palu |
1.00 |
|
|
KOTA PALU |
Optimalization of IPLT in Kota Palu and Kabupaten Sigi |
Pembangunan Soil Separation Chamber, IPLT in Kota Palu |
1.00 |
|
|
KOTA PALU |
Optimalization of IPLT in Kota Palu and Kabupaten Sigi |
Pembangunan Kolam Fakultatif, IPLT in Kota Palu |
1.00 |
|
|
KOTA PALU |
Optimalization of IPLT in Kota Palu and Kabupaten Sigi |
Rehabilitasi Kolam Indikator, IPLT in Kota Palu |
1.00 |
|
|
KOTA PALU |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
Jaringan Distribusi Utama Tondo 2 |
838.00 |
|
|
KOTA PALU |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
Jaringan Distribusi Utama Univ Tadulako |
0.00 |
|
|
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan PJU 31 Unit Balaroa Phase 2 |
270.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan DPT 410m Balaroa Phase 2 |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan 41 ruas jalan Tondo 2A-1, Tondo 2 Area |
142.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan Drainase sekitar 13600m Tondo 2A-1, Tondo 2 Area |
420.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan RTH 1600m2 Tondo 2A-1, Tondo 2 Area |
352.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan PJU 170 Unit Tondo 2A-1, Tondo 2 Area |
480.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan DPT Tondo 2A-1, Tondo 2 Area |
480.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan SPALDT seluas 3700m2 Tondo 2A-1, Tondo 2 Area |
480.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan TPS3R seluas 200m2 Tondo 2A-1, Tondo 2 Area |
3.00 |
0 |
0 |
KOTA PALU |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Reservoir 500m3 Talise |
1.00 |
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Pipa Distribusi Jaringan Air Minum Talise |
11530.00 |
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure Talise Area, Kota Palu |
Sambungan Rumah Air Minum Talise |
679.00 |
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure I |
Jalan Lingkungan Petobo |
|
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure I |
Drainase Petobo |
|
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure I |
Ruang Terbuka Hijau Petobo |
|
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure I |
Penerangan Jalan Umum Petobo |
|
|
|
KABUPATEN DONGGALA |
Construction of Settlement Infrastructure I |
Dinding Penahan Tanah Petobo |
|
|
|
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan 15 ruas jalan Tondo 2A-2, Tondo 2 Area |
955.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan Drainase sekitar 5000m Tondo 2A-2, Tondo 2 Area |
4500.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan RTH 3423m2 Tondo 2A-2, Tondo 2 Area |
50.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan PJU 47 Unit Tondo 2A-2, Tondo 2 Area |
4.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan DPT dan Bronjong Tondo 2A-2, Tondo 2 Area |
1606.00 |
0 |
0 |
KOTA PALU |
Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province |
Pekerjaan SPALDT seluas 3700m2 Tondo 2A-2, Tondo 2 Area |
50.00 |
0 |
0 |
KABUPATEN SIGI |
Local Scale Infrastructure |
Jalan, Drainase, Persampahan, Air Minum, Air Limbah, RTH, dll |
|
|
|
KABUPATEN SIGI |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
IPA 2x30lt/dt Poboya |
1.00 |
|
|
KABUPATEN SIGI |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
Jaringan Distribusi Utama ke Nunumbuku Tanamodindi |
5100.00 |
|
|
KABUPATEN SIGI |
Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu |
Jembatan Penyeberangan Pipa Poboya |
70.00 |
|
|
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s for Huntap Duyu, Kota Palu |
IPA 1x20lt/dt Duyu |
1.00 |
|
|
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s for Huntap Duyu, Kota Palu |
Reservoir 400m3 Duyu |
1.00 |
|
|
KOTA PALU |
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi |
Rehabilitasi Intake SPAM Bora Bora |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi |
Rehabilitasi IPA Bora Bora |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi |
Rehabilitasi Reservoir Bora Bora |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
IPA 1x20lt/dt Pombewe |
1.00 |
0 |
0 |
KOTA PALU |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Bangunan IPA Indoor dan Outdoor Pombewe |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Reservoir 100m3 Pombewe |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Reservoir 200m3 Pombewe |
1.00 |
0 |
0 |
KABUPATEN SIGI |
Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi |
Sambungan Rumah Air Minum Pombewe |
1.00 |
0 |
0 |
|
Construction of Water Distribution Pipe and House Connection in Kota Palu |
Jaringan Pipa Distribusi Balaroa |
|
|
|
|
Construction of Water Distribution Pipe and House Connection in Kota Palu |
Sambungan Rumah Air Minum Balaroa |
|
|
|
|
Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi |
Jaringan Pipa Distribusi Balaroa |
|
|
|
|
Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi |
Sambungan Rumah Air Minum Balaroa |
|
|
|
|
Construction of Public Facilities and Green Open Space for Satellite Huntap Phase I-B |
Ruang Terbuka Hijau Huntap 1B |
|
|
|
|
Construction of Public Facilities and Green Open Space for Satellite Huntap Phase I-B |
Taman Bermain Huntap 1B |
|
|
|
|
Construction of Public Facilities and Green Open Space for Satellite Huntap Phase I-B |
Penghijauan Jalan Huntap 1B |
|
|
|