Kemajuan Pekerjaan Infrastruktur Permukiman

Kabupaten / Kota Kabupaten / Kota Nama Kegiatan Rencana Uni Realisasi Unit Proses Unit
KOTA PALU Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu Pekerjaan JaIan Tondo 1 Phase 2 1799.00 0 0
KOTA PALU Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu Pekerjaan Drainase Tondo 1 Phase 2 570.00 0 0
KOTA PALU Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu Pekerjaan RTH Tondo 1 Phase 2 5540.00 0 0
KOTA PALU Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu Pekerjaan TPS3R Tondo 1 Phase 2 1.00 0 0
KOTA PALU Construction of Settlement Infrastructure Tondo 1 Area Phase II, Kota Palu Pekerjaan DPT Tondo 1 Phase 2 385.00 0 0
KOTA PALU Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu Jalan Lingkungan Balaroa 530.00 0 0
KOTA PALU Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu Drainase Balaroa 2527.00 0 0
KOTA PALU Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu Ruang Terbuka Hijau Balaroa 1990.00 0 0
KOTA PALU Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu Penerangan Jalan Umum Balaroa 31.00 0 0
KOTA PALU Construction of Settlement Infrastructure Balaroa Area Phase II, Kota Palu Dinding Penahan Tanah Balaroa 410.00 0 0
KABUPATEN SIGI Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi Pekerjaan Rehabilitasi Intake Bora 1.00 0 0
KABUPATEN SIGI Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi Pekerjaan Rehabilitasi IPA Dan Reservori Bora 1.00 0 0
KABUPATEN SIGI Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi Pekerjaan Jaringan Pipa HDPE Bora Pombewe, Watunonju dan Oloboju 1.00 0 0
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Jalan Lingkungan Tondo 2 13841.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Drainase Tondo 2 25918.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Ruang Terbuka Hijau Tondo 2 9725.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Penerangan Jalan Umum Tondo 2 307.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Dinding Penahan Tanah Tondo 2 0.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Bronjong Tondo 2 0.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu IPAL Tondo 2 2.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Pipa Distribusi Jaringan Air Limbah Tondo 2 24496.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Sambungan Rumah Air Limbah Tondo 2 1055.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu TPS3R Tondo 2 1.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Reservoir 500m3 Tondo 2 1.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Sumur Dalam Tondo 2 2.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Pipa Distribusi Jaringan Air Minum Tondo 2 19628.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Biofilter Tondo 2 41.00
KOTA PALU Construction of Settlement Infrastructure Tondo 2 Area, Kota Palu Sambungan Rumah Air Minum Tondo 2 1102.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan jalan sepanjang 7043m, Talise Area 7043.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan Drainase 11693m, Talise Area 11693.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan RTH 52000m2, Talise Area 52000.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan PJU 221 Unit, Talise Area 225.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan DPT 18860m, Talise Area 18860.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan Bronjong 6500m2, Talise Area 6500.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Toilet Umum 5 bilik 1 unit, Talise Area 687.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan Persampahan, Talise Area 2.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan 2 SPALDT, masing-masing 2590m2, Talise Area 12591.00
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Pekerjaan SPAM (Reservoir, SR, Jaringan Air), Talise Area 671.00
KABUPATEN SIGI Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi Pekerjaan Outlet dan Normalisasi Sungai Pombewe sepanjang 375m, Pombewe Area Phase II 0.00 0 0
KABUPATEN SIGI Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi Pekerjaan Penanganan Tebing 940m, Pombewe Area Phase II 650.00 0 0
KABUPATEN SIGI Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi Pekerjaan Jalan Inspeksi dan drainase Reservoir 650m, Pombewe Area Phase II 1.00 0 0
KABUPATEN SIGI Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi Pekerjaan Gedung Pertemuan, Pombewe Area Phase II 1.00 0 0
KABUPATEN SIGI Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi Pekerjaan pedestrian dan talud kavling, Pombewe Area Phase II 0.00 0 0
KABUPATEN SIGI Construction of Settlement Infrastructure Pombewe Area Phase II, Kabupaten Sigi Pekerjaan pintu gerbang, Pombewe Area Phase II 0.00 0 0
KOTA PALU Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu Jaringan Transmisi Watutela-Poboya (WTP Watutela akan ke tondo 1) 3551.00
KOTA PALU Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu Jaringan Distribusi Utama Talise 845.00
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Sambungan Rumah Air Limbah 1.00 0 0
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Pekerjaan Jaringan Pipa dan SR Desa Pombewe, SPAM Piping Network for Huntap Pombewe 205.00 0 0
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Pekerjaan Jaringan Pipa HDPE Desa Loru dan Pombewe, SPAM Piping Network for Huntap Pombewe 0.00 0 0
KOTA PALU Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu Pekerjaan Penggantian Pipa Transmisi, SPAM Poboya & SPAM Huntap Duyu 1134.00 0 0
KOTA PALU Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu Pekerjaan relokasi jaringan distribusi, SPAM Poboya & SPAM Huntap Duyu 774.00 0 0
KOTA PALU Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu Pekerjaan Jaringan Pipa 385m ke Huntap Balaroa, SPAM Poboya & SPAM Huntap Duyu 1.00 0 0
KOTA PALU Optimalization of SPAM Poboya & SPAM Huntap Duyu, Kota Palu Pekerjaan Pengadaan Mesin Pompa untuk Huntap Duyu, SPAM Poboya & SPAM Huntap Duyu 383.00 0 0
KOTA PALU Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi Pembangunan Lokasi Pengolahan (Recycling), Debris Waste Management in Kota Palu 0.00
KOTA PALU Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi Penghancuran Gedung/Fasilitas Publik Rusak dan Pengangkutan ke TPA, Debris Waste Management in Kota Palu 0.00
KOTA PALU Optimalization of IPLT in Kota Palu and Kabupaten Sigi Pekerjaan atap penutup Sludge Dry Bed, IPLT in Kota Palu 1.00
KOTA PALU Optimalization of IPLT in Kota Palu and Kabupaten Sigi Pembangunan Soil Separation Chamber, IPLT in Kota Palu 1.00
KOTA PALU Optimalization of IPLT in Kota Palu and Kabupaten Sigi Pembangunan Kolam Fakultatif, IPLT in Kota Palu 1.00
KOTA PALU Optimalization of IPLT in Kota Palu and Kabupaten Sigi Rehabilitasi Kolam Indikator, IPLT in Kota Palu 1.00
KOTA PALU Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu Jaringan Distribusi Utama Tondo 2 838.00
KOTA PALU Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu Jaringan Distribusi Utama Univ Tadulako 0.00
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan PJU 31 Unit Balaroa Phase 2 270.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan DPT 410m Balaroa Phase 2 1.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan 41 ruas jalan Tondo 2A-1, Tondo 2 Area 142.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan Drainase sekitar 13600m Tondo 2A-1, Tondo 2 Area 420.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan RTH 1600m2 Tondo 2A-1, Tondo 2 Area 352.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan PJU 170 Unit Tondo 2A-1, Tondo 2 Area 480.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan DPT Tondo 2A-1, Tondo 2 Area 480.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan SPALDT seluas 3700m2 Tondo 2A-1, Tondo 2 Area 480.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan TPS3R seluas 200m2 Tondo 2A-1, Tondo 2 Area 3.00 0 0
KOTA PALU Construction of Settlement Infrastructure Talise Area, Kota Palu Reservoir 500m3 Talise 1.00
KABUPATEN DONGGALA Construction of Settlement Infrastructure Talise Area, Kota Palu Pipa Distribusi Jaringan Air Minum Talise 11530.00
KABUPATEN DONGGALA Construction of Settlement Infrastructure Talise Area, Kota Palu Sambungan Rumah Air Minum Talise 679.00
KABUPATEN DONGGALA Construction of Settlement Infrastructure I Jalan Lingkungan Petobo
KABUPATEN DONGGALA Construction of Settlement Infrastructure I Drainase Petobo
KABUPATEN DONGGALA Construction of Settlement Infrastructure I Ruang Terbuka Hijau Petobo
KABUPATEN DONGGALA Construction of Settlement Infrastructure I Penerangan Jalan Umum Petobo
KABUPATEN DONGGALA Construction of Settlement Infrastructure I Dinding Penahan Tanah Petobo
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan 15 ruas jalan Tondo 2A-2, Tondo 2 Area 955.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan Drainase sekitar 5000m Tondo 2A-2, Tondo 2 Area 4500.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan RTH 3423m2 Tondo 2A-2, Tondo 2 Area 50.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan PJU 47 Unit Tondo 2A-2, Tondo 2 Area 4.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan DPT dan Bronjong Tondo 2A-2, Tondo 2 Area 1606.00 0 0
KOTA PALU Construction of Supporting Infrastructure for Satellite Huntap in Central Sulawesi Province Pekerjaan SPALDT seluas 3700m2 Tondo 2A-2, Tondo 2 Area 50.00 0 0
KABUPATEN SIGI Local Scale Infrastructure Jalan, Drainase, Persampahan, Air Minum, Air Limbah, RTH, dll
KABUPATEN SIGI Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu IPA 2x30lt/dt Poboya 1.00
KABUPATEN SIGI Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu Jaringan Distribusi Utama ke Nunumbuku Tanamodindi 5100.00
KABUPATEN SIGI Construction of Water Treatment Plant 2x30 L/s for Huntap Tondo 1, Tondo 2 & Talise, Kota Palu Jembatan Penyeberangan Pipa Poboya 70.00
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s for Huntap Duyu, Kota Palu IPA 1x20lt/dt Duyu 1.00
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s for Huntap Duyu, Kota Palu Reservoir 400m3 Duyu 1.00
KOTA PALU Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi Rehabilitasi Intake SPAM Bora Bora 1.00 0 0
KOTA PALU Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi Rehabilitasi IPA Bora Bora 1.00 0 0
KOTA PALU Construction of Bora SPAM IKK Piping Network for Huntap Pombewe, Kab. Sigi Rehabilitasi Reservoir Bora Bora 1.00 0 0
KOTA PALU Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi IPA 1x20lt/dt Pombewe 1.00 0 0
KOTA PALU Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Bangunan IPA Indoor dan Outdoor Pombewe 1.00 0 0
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Reservoir 100m3 Pombewe 1.00 0 0
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Reservoir 200m3 Pombewe 1.00 0 0
KABUPATEN SIGI Construction of Water Treatment Plant 1x20 L/s and SPAM Piping Network for Huntap Pombewe, Kab. Sigi Sambungan Rumah Air Minum Pombewe 1.00 0 0
Construction of Water Distribution Pipe and House Connection in Kota Palu Jaringan Pipa Distribusi Balaroa
Construction of Water Distribution Pipe and House Connection in Kota Palu Sambungan Rumah Air Minum Balaroa
Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi Jaringan Pipa Distribusi Balaroa
Construction of Water Distribution Pipe and House Connection in Kabupaten Sigi Sambungan Rumah Air Minum Balaroa
Construction of Public Facilities and Green Open Space for Satellite Huntap Phase I-B Ruang Terbuka Hijau Huntap 1B
Construction of Public Facilities and Green Open Space for Satellite Huntap Phase I-B Taman Bermain Huntap 1B
Construction of Public Facilities and Green Open Space for Satellite Huntap Phase I-B Penghijauan Jalan Huntap 1B




Logo Sitaba

Kementerian Pekerjaan Umum dan Perumahan Rakyat


Pusat Data dan Teknologi Informasi

Jl. Pattimura No. 20, RT. 2 / RW. 1, Selong, Kec. Kebayoran Baru, Kota Jakarta Selatan, Daerah Khusus Ibukota Jakarta 12110

PMC Jakarta

- Jl. Benda IV No. 5 Kebayoran Baru Jakarta

Jumlah Pengunjung
BPPW Sulawesi Tengah

Jl. Soekarno Hatta No.30, Talise, Kec. Palu Tim., Kota Palu, Sulawesi Tengah 94118

PMC Palu

- Jl. Zebra 4 Lorong 1 No. 6 Kel. Birobuli Utara Kec. Palu Selatan - Palu

Sosial Media LIPPM

Facebook instagram twitter youtube email

© Sitaba. All Rights Reserved.